Knowledge

Home/Knowledge/Details

Unpacking inspection of distribution box

When unpacking the distribution box, we must first check the number of equipment according to the design drawings and the equipment list. Check the specifications and models of the equipment body and accessories and spare parts according to the equipment packing list, and check the technical data such as the product certificate and instruction manual. The second is to check the appearance of the cabinet without damage and deformation, complete paint, consistent color, complete electrical installations and components in the cabinet, secure installation, no damage or loss. Then, according to the construction schedule, combined with site conditions, hoisting methods and the length of the equipment arrival time, flexible arrangements. The equipment should be put in place as soon as possible after unpacking to shorten the on-site storage time and storage time after unpacking. The visual inspection can be done first, and the inspection inside the cabinet will be carried out after it is in place.