We all know how useful meter boxes are, but it's not easy to say that you can use them. Today we're talking about the use of glass meter boxes, but we're not advocating a do-it-yourself approach! Because safety is the most important thing!

Characteristics:
1. Corrosion-resistant: FRP material has excellent corrosion-resistant properties, making it suitable for use in harsh environments.
2. High strength: FRP material has high strength and can withstand a lot of pressure and impact, so it’s not easy to deform or break.
3. Lightweight: FRP material is light in weight, making it easy to transport and install.
4. Good insulation: FRP material has good insulation performance and is resistant to high voltage, making it safe to use.

FRP meter box includes single-phase meter box and three-phase meter box, suitable for AC 50HZ or 60HZ, rated working voltage to 200V, 380V, 690V, rated working current of 10A~225A in the power supply system, for single-phase electric energy and power electric energy measurement and control management.
FRP meter box method/step.
1.FRP meter box in the use of the first point to note is to pay attention to the use of conditions, because the meter box on the temperature requirements are very high.A ambient temperature -40 ° ~ +80 ° C, and the average temperature does not exceed +35 °.B air clean, relative humidity in 40 ° C when not more than 80%, the temperature is lower when allowed to have a higher relative temperature.
2. Multi-air energy high protection glass steel meter box cover using imported weather-resistant polycarbonate (PC), the box bottom using flame retardant ABS and PC/ABS alloy engineering plastic manufacturing. With high insulation performance, high transparency, anti-UV, aging resistance, acid rain, high temperature, low temperature, high impact strength, and has good rain, dust, ventilation, heat dissipation and other functions, the normal service life of more than 20 years.
3. FRP meter box adopts integrated design concept and consists of one, two, four, six, eight, ten, twelve, fourteen, sixteen meter boxes and main control box. It can be installed and used in a single box or assembled and used in multiple boxes by the main control box. Total switch control multi-box installation, the entire metering circuit set in an integrated closed box, user separation control, easy to install management, and can prevent electricity thieves to touch the measurement of the installed amount, to prevent electricity theft.
4. FRP meter box shape design is beautiful, smooth lines, transparent and clear box lid, the box table, electrical components until the layout is reasonable, can be hot to install a variety of models of electrical components, collector collector, etc.. The box lid is connected to the box body by a three-way hook, with a special lead seal screw device in the middle under the meter position of the box lid, and the lower part of the box lid is interlocked with the box body by lead seal screw and padlock, which can only be opened by the electric manager with a special lead seal screw spanner and key. The full transparency of the box lid facilitates clear reading of the plagiarism and timely direct observation of the various abnormalities in the box. Thus, the hidden dangers of the electricity clock can be eliminated in advance to achieve the management goal of "safe electricity use, prevention first".